Skip to Navigation | Skip to Content
» Backto: » Parks home

Trail Inspection Form

1. Trail Information

2. Inspected By: Staff Volunteer

Inspection Date:   Name:
Park Name:      
Park Code:   Phone:
Trail Name:   Total work hours:
Section: From:
To:     
     

3. Trail Inspection & Basic Maintenance Work

Inspection and basic maintenance completed.
Inspection completed, basic maintenance work needed.
Major problems found, listed below.
Storm project.

4. Trail Problems

Problem severity:
Tree(s) down on trail
Leaner Tree(s)
Branches hanging over trail
Tread Washout
Mudhole/Widening
Dump Site
Other
Largest Tree Size: Less than 12" 12"-36" >36"
Description/Location

(Maximum characters: 250)   You have characters left.

5. Trail Structure Problems

SAFETY HAZARD Problem severity:
Bridge   Stairway   Culvert   Sign   Other

6. Trailhead Information Kiosks

Kiosk structure problems observed
Needs current park map/map faded
Needs updated information

7. Major Work Completed, General Observations and Suggestions


(Maximum characters: 1000)   You have characters left.
 
 
Please email any questions regarding the Trail Inspection form to MCP-NSTrails@montgomeryparks.org.